Commonwealth Fusion Systems
Senior Manager, Mechanical Engineering — Vacuum Vessel
Devens, MA · On-site · Senior
- Discipline
- Mechanical
- Industry
- Energy
Spec sheet
Automatically summarized from the employer’s posting. Check the original description below for full requirements.
Engineering
Senior Manager, Mechanical Engineering — Vacuum Vessel leading the design and delivery of the ARC vacuum vessel for Commonwealth Fusion Systems, a large-scale mechanical structure designed to withstand extreme heat flux and integrate a remote handling system for maintenance.
Day shift
Required
- design and delivery of ARC vacuum vessel
- mechanical structures subject to extreme heat flux
- remote handling system maintenance
- lead the design
- fusion power plant component
- ARC tokamak vacuum vessel
- heat removal via molten salt
Preferred
- project leadership in large-scale mechanical structures
- experience with vacuum vessels or high-heat applications
- remote handling integration
- systems engineering coordination
Employer description
About Commonwealth Fusion Systems:
Commonwealth Fusion Systems is on a mission to deliver the urgent transition to fusion energy.
Combining decades of research, top talent, and new technologies, we’re designing and building commercially viable fusion power plants. And we’re working with policymakers, suppliers, and many others to build the energy industry of the future.
We’re in the best position to make it happen. Since 2018, we’ve raised $4 billion of capital, making us the largest and leading fusion company in the world.
Now we’re looking for more thinkers, doers, builders, and makers to join us. People who’ll bring new perspectives, solve tough problems, and thrive as part of a team.
If that’s you and this role fits, we want to hear from you.
Join the power movement as a Senior Manager, Mechanical Engineering
CFS is looking for a creative, experienced mechanical engineering manager to lead the design and delivery of the ARC vacuum vessel. Commonwealth Fusion Systems is currently designing the ARC fusion power plant. Within the ARC plant, the ARC tokamak consists of many large mechanical structures that support the large loads and extreme conditions of the fusion plasma. One of the newest and most interconnected components in ARC will be the vacuum vessel, a hundred-ton mechanical structure that surrounds the fusion plasma. This structure must withstand extreme heat fluxes on the plasma-facing side and effectively remove this heat via flowing molten salt on the other side of the vessel. This vessel must also be replaceable via a remote handling system during regular plant maintenance cycles. Come lead the design of a critical portion of the world’s first fusion power plant!
Stateside Spec lists roles for engineering teams in the United States. Work-authorization notes come from the employer. We do not guarantee visa policy. Apply off-site. Report an issue with this listing View employer source